Wayfinder Atlas

Taushubetsu River Bridge

In Japanese: タウシュベツ川橋梁
Open by month

Open in January — at its best.

Open in February — at its best.

Open in March — at its best.

Open in April — at its best.

Partly closed in May: The bridge emerges from about January, is fully visible before Golden Week, and starts to sink from about May until it is underwater in summer (Kamishihoro town).

Open in June. No seasonal closure recorded.

Open in July. No seasonal closure recorded.

Open in August. No seasonal closure recorded.

Open in September. No seasonal closure recorded.

Open in October. No seasonal closure recorded.

Open in November. No seasonal closure recorded.

Open in December. No seasonal closure recorded.

Checked against the official site on 2026-10-19.

Taushubetsu River Bridge
Photo: MaedaAkihiko / CC BY-SA 4.0, resized

A 130 m concrete arch bridge on the former JNR Shihoro Line, completed in 1937. It appears from Lake Nukabira around January as the water drops, starts to sink from about May and lies under the lake by summer.

Hokkaido Heritage (Shihoro Line concrete arch bridges)

Nearby

Travel times are rough estimates by car.

Plan by month in the app →

Best time
January, February, March, April
Closed or limited
The bridge emerges from about January, is fully visible before Golden Week, and starts to sink from about May until it is underwater in summer (Kamishihoro town).
Getting there
8 km by car from Nukabira Onsen toward Sounkyo, then a 200 m walk from the lay-by on the national road to the Taushubetsu viewpoint, which looks across about 700 m of water to the bridge
Easier with a tour or car
Good to know
To get close to the bridge, join a tour by the Higashi-Taisetsu Nature Guide Center (in winter, a 4 km round trip on snowshoes across the frozen lake). The viewpoint lay-by holds about 5 cars
Time needed
45 min

Checked against the official Japanese website on 2026-10-19. Report outdated info